Sequence
This activity performs the contained activities in top-down order.
The Parallel activity is comprised of two or more Sequence activities that run at the same time. More information.
How does this activity look in the Designer Pane?
- Drag it from the Toolbox Pane and drop it in the Designer Pane.
To configure this activity
- Select the activity in the Designer Pane to configure the following property boxes.
- Drag and drop activities into this activity.