Sequence
This activity performs the contained activities in top-down order.
The Parallel activity is comprised of two or more Sequence activities that run at the same time. Learn more about parallel branch configuration.
How does this activity look in the Designer Pane?
- Drag it from the Toolbox Pane and drop it in the Designer Pane.
To configure this activity
- Select the activity in the Designer Pane to configure the following property boxes.
- Drag and drop activities into this activity.